| Electronic Components Datasheet Search |
|
G3F-PB80-JGF Datasheet(PDF) 13 Page - Magnetrol International, Inc. |
|
|
|||||||||||||||||||||||||||||
G3F-PB80-JGF Datasheet(HTML) 13 Page - Magnetrol International, Inc. |
|
13 / 36 page ![]() 46-624 Series 3 Liquid Level Switches ASME B31.1 Construction 13 4.2 What To Do — Every 12 Months (minimum) 4.2.1 Switch Corrosion Inspection For every 12 months in service, conduct the following maintenance and inspection checks in addition to cus- tomer specific or code requirements. NOTE: Conduct this inspection every 3 months for applications where the switches are exposed to corrosive environments. 1. Disconnect power to the switch. 2. Remove switch housing cover to inspect switch mecha- nisms for visible signs of corrosion on terminals and wires. NOTE: When removing switch housing cover, secure housing base to prevent rotation of the base and enclosing tube. If cover proves difficult to remove, loosen housing base set screws before using a crossbar to free the cover. Loosening the set screws will prevent accidental rotation of the enclosing tube and possible leakage of process media. 3. Dry contact switches should be inspected for excessive wear on actuating lever or misalignment of adjustment screw at point of contact between screw and lever. Such wear can cause false switch actuating levels. Adjust switch mechanism to compensate (if possible) or replace switch. 4. Controls may sometimes be exposed to excessive heat or moisture. Under such conditions, insulation on electrical wiring may become brittle, eventually breaking or peeling away. The resulting bare wires can cause short circuits. Check wiring carefully and replace at the first sign of brittle insulation. 5. Vibration may sometimes cause terminal screws to loosen. Check all terminal connections to be certain that screws are tight. Refer to Figure 15. 6. Conduct a continuity test for switch contacts, using a low voltage DC circuit with an indicator. 7. Switches that are corroded or that failed the contact conti- nuity test should be replaced. DO NOT operate your control with defective or maladjusted switch mechanisms (refer to bulletin on switch mechanisms furnished for service instructions.) 8. Verify that switch housing cover and conduit seal are properly closed after each inspection of the switch mechanism(s). NOTE: In applications with presence of salt-laden air or corrosive vapors, contact Magnetrol for possible alternate switch mechanisms. Mechanism clamping screw Terminal screws Figure 15 |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |