| Electronic Components Datasheet Search |
|
UM0575 Datasheet(PDF) 6 Page - STMicroelectronics |
|
|
|||||||||||||||||||||||||||||
UM0575 Datasheet(HTML) 6 Page - STMicroelectronics |
|
6 / 20 page ![]() Operation principle UM0575 6/20 1.3.2 ON state As soon as the mains voltage is applied: ● M1 is OFF because the voltage drop across the PTC is not high enough to reach the DZ1 clamping level ● T2 is then turned on, thanks to the gate current provided by R2 ● T1 is turned on thanks to the gate current provided by T2 Both T1 and the PTC are then ON. At each zero-current crossing point, the ACST6 turns off. The reapplied voltage across T1/T2 triggers back T1 which results in some voltage spikes at each zero-current crossing point (typically around 40 V as shown in Figure 6 for a 230 V compressor). Applying the click test of norm EN55014, the noise duration could last more than 200 ms (depending on the type of compressor and PTC). The individual spikes last a few hundreds of microseconds and are spaced at intervals of 10 ms, so the limits of continuous disturbance are applicable. Since the spike peaks are less than 100 V, the e-STARTER solution should fulfill the requirements of EN55014. It should be noted that tests results greatly depend on the compressor used during the tests. Figure 5. e-STARTER schematics |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |