| Electronic Components Datasheet Search |
|
FSQ211 Datasheet(PDF) 10 Page - ON Semiconductor |
|
|
|||||||||||||||||||||||||||||
FSQ211 Datasheet(HTML) 10 Page - ON Semiconductor |
|
10 / 13 page ![]() © 2007 Fairchild Semiconductor Corporation www.fairchildsemi.com FSQ211 Rev. 1.0.0 9 4.1 Overload Protection (OLP): Overload is defined as the load current exceeding a pre-set level due to an unexpected event. In this situation, the protection circuit should be activated to protect the SMPS. However, even when the SMPS is operating normally, the over- load protection (OLP) circuit can be activated during the load transition. To avoid this undesired operation, the OLP circuit is designed to be activated after a specified time to determine whether it is a transient situation or an overload situation. If the output consumes more than the maximum power determined by ILIM, the output voltage (VO) decreases below its rating voltage. This reduces the current through the opto-coupler LED, which also reduces the opto-coupler transistor current, thus increasing the feedback voltage (VFB). If VFB exceeds 3V, the feedback input diode is blocked and the 5µA current source (IDELAY) starts to charge CFB slowly up to VCC. In this condition, VFB increases until it reaches 4.5V, when the switching operation is terminated, as shown in Figure 18. Shutdown delay is the time required to charge CFB from 3V to 4.5V with 5µA current source. VFB t 3V 4.5V Overload Protection t12=CFB×(V(t2)-V(t1)) / IDELAY t1 t2 V t V V t V A I I t V t V C t DELAY DELAY FB 5 . 4 ) ( , 3 ) ( , 5 ; ) ( ) ( 2 1 1 2 12 = = = • =m Figure 18. Overload Protection (OLP) 4.2 Thermal Shutdown (TSD): The SenseFET and the control IC are integrated, making it easier for the control IC to detect the temperature of the SenseFET. When the temperature exceeds approximately 145 °C, thermal shutdown is activated. 5. Soft-Start: The FPS has an internal soft-start circuit that slowly increases the feedback voltage, together with the SenseFET current, right after it starts up. The typical soft-start time is 15ms, as shown in Figure 19, where progressive increment of the SenseFET current is allowed during the start-up phase. Soft-start circuit progressively increases current limits to establish proper working conditions for transformers, inductors, capacitors, and switching device. It also helps prevent transformer saturation and reduces the stress on the secondary diode. 2.14ms 7steps ILIM t Drain current Figure 19. Internal Soft-Start 6. Burst Operation: To minimize the power dissipation in standby mode, the FSQ211 enters burst mode operation. As the load decreases, the feedback voltage decreases. The device automatically enters burst mode when the feedback voltage drops below VBURL (0.55V). At this point, switching stops and the output voltages start to drop. This causes the feedback voltage to rise. Once is passes VBURH (0.70V), switching starts again. The feedback voltage falls and the process repeats. Burst mode operation alternately enables and disables switching of the power MOSFET to reduce the switching loss in the standby mode. OSC 4 Vfb S R Q GATE DR IVE R 5µA 400µA 0.70V /0.55V on/off Burst Operation Block Figure 20. Burst Operation Block V FB Vds 0.55V 0.7V Ids Vo Vo set t Figure 21. Burst Operation Function |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |