| Electronic Components Datasheet Search |
|
705-5202-21 Datasheet(PDF) 25 Page - Magnetrol International, Inc. |
|
|
|||||||||||||||||||||||||||||
705-5202-21 Datasheet(HTML) 25 Page - Magnetrol International, Inc. |
|
25 / 28 page ![]() R I G I D S I N G L E R O D P R O B E D I M E N S I O N S I N C H E S ( m m ) 1. Turbulence For 7xF/7x1/7x2/7xJ (single rod/cable) The bottom of the probe should be stabilized if tur- bulence will cause a deflection of more than 3" at 10' (75 mm at 3 m) of length. The probe should not make contact with metal. A TFE bottom spacer for 7xF GWR probes or PEEK spacer for 7xJ is optional. 2. Nozzles: do not restrict the performance by ensuring the following: For 7xF/7x1/7x2/7xJ (single rod/cable): 1. Nozzle must be 50 mm (2") or larger diameter. 2. Nozzle inside diameter (A) should be ≥ to nozzle height (B). If this is not the case, it is recommend- ed to adjust BLOCKING DISTANCE and/or SENSI- TIVITY settings. For 7x5/7x7 (twin rod/cable): 1. Nozzle should be DN80 (3") diameter or larger. 2. For nozzles < DN80 (3") diameter, the bottom of the inactive section of the probe should be flush with the bottom of the nozzle or extend into the vessel. 3. Metallic (conductive) obstructions in tank. For 7xF/7x1/7x2 (single rod/cable) A metal stillwell/cage of max. 6"/DN150 size or a metal tank wall within 150 mm of the probe mount- ing will allow the unit to operate accurately in media with dielectrics down to ε r 1.9. Objects in the prox- imity can cause erroneous readings For 7x5/7x7 (twin rod/cable) Mount the probe more than 25 mm (1") from any metallic object/vessel wall. 4. Non-metallic vessels For 7xF/7x1/7x2/7xJ (single rod/cable) Flange (metal) mounting is recommended for optimum performance. High level shutdown / Overfill protection Special consideration is necessary in any high level shut- down / overfill protection application where single rod GWR probes are used. To ensure proper measurement, the guided wave radar probe should be installed so the maximum overfill level is at a minimum of 120 mm (4.8") up to 910 mm (36") – blocking distance depending appli- cation below the process connection. Consult factory for further information. Distance to probe Acceptable objects < 150 mm (6") Continuous, smooth, parallel, conductive surface (e.g. metal tank wall); probe should not touch tank wall > 150 mm (6") < 1"/DN25 diameter pipe and beams, ladder rungs > 300 mm (12") < 3"/DN80 diameter pipe and beams, concrete walls > 450 mm (18") All remaining objects 25 “ I N T A N K ” S T A N D A R D S I N G L E R O D P R O B E M O U N T I N G C O N S I D E R A T I O N S Pipe reducers should not be used Correct installation A B 7xF/7xJ with threaded connection max. 240" (6 m) 7xF/7xJ with flanged connection max. 240" (6 m) Spacer (end view) 3.28 (83) 4.12 (105) 10.08 (256) 1.42 (36) 2.36 (60) 2.24 (57) Optional Spacer Optional Spacer 4.00 (102) Ø Rod Bare 0.50 (13) / PFA insulated 0.62 (16) Process Conn. 2 cable entries Probe Insertion Length for 2" (G2) BSP process connection Probe Insertion Length for 2" NPT process connection 45° 0.50 (13) Ø Rod Probe Insertion Length 1.90 (49) |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |